Access and availability of water for a multitude of purposes are necessary for public health and community welfare, including industrial use, effective wastewater treatment by Waste Water Treatment Companies, and safe drinking water treatment & management for all.
However, when it comes to rendering Waste Water Treatment Services, it’s worthwhile to consider: Which to opt for: small or large WWTPs & which suits your budget better?
Choosing between small (<500 m3/day) and large (>5000 m3/day) Waste Water Treatment Plants (WWTPs) involves balancing initial capital investment (CAPEX) with long-term operational costs (OPEX) and available space. Small plants offer lower upfront expenses and modularity, whilst large plants benefit from economies of scale, requiring massive, specialized investments.
Without batting an eyelid, rely on CH Four Energy Solutions, one of the prominent Waste Water Treatment Companies in the vicinity of Pune, Maharashtra, India, a pro in tackling industrial wastewater concerns, treating and managing them accordingly, as well as the prime manufacturer of Waste Water Treatment Plant.
Overview of Budget Considerations for CH Four WWTPs
Here is a lowdown of Small Vs Large Waste Water Treatment Plants (WWTPs) manufactured by CH Four regarding budget:
Small WWTPs (<500 m3/day or <50 KLD)
Small, often decentralized or packaged plants are usually more budget-friendly and intended for lower-volume users, such as residential apartments, small-scale industries, and communities.
Cons – Higher expense per cubic meter treated; restricted to smaller volumes.
Initial Cost (CAPEX) – Markedly lower, with small 2-10 KLD systems ranging from INR 1.5-6 lakhs, and 20-50 KLD systems from INR 10-30 lakhs. Packaged plants are often cheaper for initial installations.
Operational Cost (OPEX) – Higher per unit of treated water. Monthly expenses for small systems range from INR 10,000 to 60,000, depending on capacity.
Pros – Lower entry barrier, less land needed, lower initial investment, high adaptability to modular growth.
Large WWTPs (>5000 m3/day)
Large, centralized plants offering Waste Water Treatment Services are designed for cities or large industrial complexes, enabling higher efficiency for high-volume, continuous operation.
- Initial Cost (CAPEX) – Extremely high. A 500 KLD system in India may cost between Rs. 5 crore and Rs.10 crore.
- Operational Cost (OPEX) – Lower per unit of treated water owing to economies of scale.
- Pros – Lower operating expense per cubic meter, high efficiency, and superior/optimal capability to tackle complex contaminants.
- Cons – Massive upfront investment, higher land requirement, complex and expensive to maintain.
Main Financial Factors to Take into Account
- Economies of Scale – With the increase of plant size manufactured by CH Four, the cost per cubic meter of wastewater treated tends to decrease.
- Energy Consumption – 50-70% of total operating costs are energy-oriented. Energy-efficient systems offer lower long-term expenses even if they cost slightly more initially.
- Overbuilding Risk Factor – Over-sizing a plant, such as a large one, results in inefficient or faulty operation, higher maintenance costs, and a ‘stranded investment’ eating into the budget.
- Space & Installation – Installation may add 15-40% to the entire budget. Packaged wastewater treatment plants are often faster and cheaper to set up than bespoke, extensive infrastructure.
Are you aware, some industries make many common mistakes in Wastewater treatment and can turn into danger? Well, you are thinking for a solution. Read our blog on “Common Wastewater Treatment Mistakes & How to Avoid Them” to know more about it.
Now the Million Dollar Question: Which Suits Your Budget Better-Small Or Large WWTPs?
General Recommendation
- Opt for Small/Packaged Systems if one has budgetary constraints, a small land area, and a low volume, such as in residential or small-business ventures.
- Select Large Systems if they handle large-scale, consistent municipal-level, or significant industrial waste and possess the capital to invest in long-term efficiency.
For projects requiring growth, a modular small plant is a more budget-friendly option than constructing a single massive plant on an immediate basis.
However, Waste Water Treatment Plant (WWTP) or Sewage Treatment Plant (STP) regulations become increasingly stringent, with a focus on stricter effluent quality, mandatory reuse, and real-time monitoring or surveillance, with standards set up by the Central Pollution Control Board (CPCB) and State Pollution Control Boards (SPCBs) in India, significantly updated for 2025/2026.
Key Regulations for Large WWTPs (>500 KLD or Major Municipalities)
Large-scale plants encounter rigorous, continuous monitoring and state-of-the-art treatment requirements to deliver remarkable Waste Water Treatment Services.
Operational/Functional Requirements – Mandatory 8-hour equalization tanks for balancing fluctuations and 2-day treated water storage capacity for reusage.
Real-time Monitoring – Mandatory, live online monitoring systems (OCEMS) are needed for tracking parameters like pH, BOD, COD, TSS, and flow rates.
Effluent Standards (2025/2026) – Stringent limits are being implemented for Biochemical Oxygen Demand (BOD), Chemical Oxygen Demand (COD), and Total Suspended Solids (TSS).
Sludge Management – For wastewater treatment plants with <500 KLD, horizontal centrifuge systems are usually recommended for dewatering to manage high sludge volumes effectively.
Key Regulations for Small/Medium WWTPs (<500 KLD & Residential)
Small-scale plants in housing societies or smaller towns are now treated as ‘bulk users’ or specialized local systems, requiring:
Small-scale plants in housing societies or smaller towns are now treated as ‘bulk users’ or specialized local systems, requiring:
- Mandatory Reuse – Residential complexes/societies should obtain 20% treated water reuse by 2027 and 50% by 2030.
- Sludge Disposal – Vertical centrifugal usage, belt press, screw press systems are standard for smaller capacities for managing sludge, shifting away from simple, inefficient drying beds.
- Technological Shift – Membrane Bioreactor (MBR) Adoption technology is increasingly needed to ensure high-quality, reusable water, particularly in limited space.
- Installation Thresholds – In many states, projects with 20 or more units or >2000 m2 built-up area should install a WWTP.
General Regulatory Trends (2025-2030)
- Strict Penalty Measures – Boards are initiating heavy fines up to Rs 10 lakh/day, for non-compliance with the Waste Water Treatment Plant.
- Reuse Mandate – Strong focus on ‘Zero Liquid Discharge’ (ZLD) or high-level recycling, specifically for new, significant, high-rise developments.
- Standardization – 10-12 mm bar screens application/usage is compulsory as a first step into regulating solids, irrespective of plant size.
CH Four Energy Solutions, one of the leading Waste Water Treatment Companies in Maharashtra, Pune, India, serves under Maharashtra Pollution Control Board (MPCB)-a stringent compliance regulatory body dealing with Waste Water Treatment Services in Maharashtra. However, the MPCB Liaison Services hired by CH Four are for the following reasons:
- Expert Guidance with complex laws & rules, compliance with industrial wastewater & contaminant control requirements.
- Comprehensive & Seamless Documentation, like applying for MPCB consents and licenses, extensive report preparation, site plans compilation, etc.
- Proactive Risk Mitigation via potential risks identification & compliance gaps.
- Effortless Coordination with the organization’s officials, demonstrating cases clearly, addressing queries quickly, and following up on application concerns.
- Continuous Compliance Monitoring of the company’s compliance, performing audits and inspections, handholding every stage of the journey, making one sustainably compliant.
- Pollution & Contaminant Control & Managing Guidance implementing effective pollution and contaminant control measures.
- Focus on Core Business by handling environmental & pollution control compliance on one’s behalf, freeing up time to focus on other core business aspects.
Embrace CH Four Energy Solutions as Your ‘Go-To’ Solution Provider & Get Your Concerns Sorted Out Permanently!
Connect with Our Specialists Via Email at info@chfour.net



